Stop a job in your Elastic High Performance Computing (E-HPC) cluster when it fails to run or is no longer needed.
Prerequisites
Before you begin, ensure that:
The job is in an incomplete state. Only jobs in the following states can be stopped:
Scheduler Stoppable states Slurm Pending, Running PBS QUEUED, RUNNING
Stop a job
Log on to the E-HPC console.
In the left part of the top navigation bar, select a region.
In the left-side navigation pane, click Cluster.
On the Cluster List page, find the cluster and click the cluster ID to go to the Cluster Details page.
In the left-side navigation pane, click Job Management.
On the Job Management page, select one or more jobs and click Stop at the bottom of the page.
In the confirmation dialog, click OK.
What's next
If you stopped a job because it was running abnormally, check the job execution logs to diagnose the issue. See Logs.