This topic describes the steps to change the schedule of a data integration task.

Procedure

  1. Log on to the Data Transmission Service console.
  2. In the left-side navigation pane, click Data Integration.
  3. In the region selector, select the region where the target database instance resides. For example, China (Qingdao).
  4. Find the data integration task that you want to change, and then click the ID of the task.
  5. In the upper-right corner of the Basic Information section, click Modify Scheduler Policy.
  6. Update the schedule information, and then click OK.