[Upgrade] Notice of Upgrade of Network Equipment located in Alibaba Cloud London Node on May 28 and May 30, 2024, from 9:00 AM to 14:00 AM, Beijing Time
May 22, 2024
IT Hardware
Upgrade window: May 28 and May 30 2024, from 9:00 AM to 14:00 AM, Beijing time
Upgrade content: Alibaba Cloud London Availability Zone A Machine Room Network Equipment Upgrade
Upgrade impact: This operation may cause network jitter of up to 30 seconds for the newly established network connection in room A of the London availability zone, and the existing connections will not be affected. If you use products such as RDS MySQL, Redis, PolarDB MySQL, Lindorm, etc., you may be affected by this upgrade. We suggest that your application make good connections and retry, and pay attention to the business situation during the upgrade period.
We apologize for the inconvenience caused to you. If you have any questions, please contact us for consultation and feedback.
Upgrade content: Alibaba Cloud London Availability Zone A Machine Room Network Equipment Upgrade
Upgrade impact: This operation may cause network jitter of up to 30 seconds for the newly established network connection in room A of the London availability zone, and the existing connections will not be affected. If you use products such as RDS MySQL, Redis, PolarDB MySQL, Lindorm, etc., you may be affected by this upgrade. We suggest that your application make good connections and retry, and pay attention to the business situation during the upgrade period.
We apologize for the inconvenience caused to you. If you have any questions, please contact us for consultation and feedback.